| Document Description | Last Updated | Filename | |
| Warranty for the PRO GP-SL050 | 9/3/2009 | GP Series Warranty.pdf |
|
| Explanation of the Audible Alarms and Visual Feedback | 3/4/2009 | GPSL050 Audible and Visual Feedback.pdf |
|
| Instructions for testing the battery and battery charger | 3/4/2009 | GPSL050 Battery & Charger Test.pdf |
|
| Instructions for checking the wiring harness between the logic board and motor drive board | 3/4/2009 | GPSL050 BLDC Speed Control Connections.pdf |
|
| Instructions for testing the ground connections on the operator housing | 3/4/2009 | GPSL050 Ground Screw Connection.pdf |
|
| Instructions for testing the incoming AC line voltage | 3/4/2009 | GPSL050 Incoming AC Test.pdf |
|
| Instructions for testing the motor amperage | 3/4/2009 | GPSL050 Motor Amperage Test.pdf |
|
| Instructions for testing the motor drive board | 3/4/2009 | GPSL050 Motor Drive Board Testing.pdf |
|
| Show Page: | 1 | (Total Records: 8) | | Records Per Page: | |
|